EPC project, which includes detailed engineering, civil works, mechanical assembly, electrical assembly and instrumentation, pre-commissioning and start-up, for a new Corn Oil unit in an existing Biofuel (Bioethanol) plant. The project is made up of 2 parts, one for process, with a building that houses 2 tricanters, several centrifugal and positive displacement pumps, and several tanks, and another for storage, with 3 tanks of 150m3 each and a loading station, with charging and recirculation pumps. |