UTE Abener - Teyma

Location: Logrosán (Cáceres)

Work carried out

Main mechanical assembly, piping, support elements, equipment, turbines and assistance with the start-up of the power island at the Solaben III solar energy plant.

  • Prefabrication of pipes
  • Assembly of Power Island Piping
  • Supply, prefabrication and painting of structural supports
  • On-site assembly of structural supports
  • Installation of manual and automatic valves
  • Installation of dynamic and static equipment
  • Alignment pumps
  • Design, prefabrication and assembly of small diameter pipe
  • Design, prefabrication and assembly of structural supports for small diameter pipe
  • Design and execution of hydraulic test circuits
  • Document management and processing of Quality Dossier