Dragados Offshore

Location: Puerto Real (Cádiz)

Work carried out

Installing mechanics and instrumentation of a UCS system for a 2/7s Eldfisk jacket. Laying of 10,000 m of tubing, automatic valves, pressure transmitters. Involvement in commissioning. Installing auxiliary systems such as the Gripper System.

  • Laying of Tubing of jacket for buoyancy  and flooding system
  • Signal cable assembly for motorized valves and instruments
  • Installation and commissioning of motorized valve
  • Installation and commissioning of transmitters instruments
  • Commissioning of existing installation